The initial Feed Stream is perhaps the most fundamental, and important, aspect of the AggFlow DM program. Because the Feed Stream determines the initial flow rate, gradation of material and relative material to water rate for the entire simulation. Accuracy at this step is critical.
Hover Over Image to Enlarge
- Select the Add Water tab in Step 3 of the Adjust Set-up window.
- Define the Relative Feed to Water Values. Enter the Solids by Weight or Volume figures.
- Specify the Absolute Values:
- Mass Rate
- Specific Density
- Specific Gravity
- Flow Rate
- Install the Water Rate
Important! The Add Water values are relative to each other. Changes a setting will automatically affect and recalculate the other values.